Progress Update
-
- Posts: 215
- Joined: Thu Apr 08, 2010 4:56 pm
Re: Progress Update
Just to show that I am not 100% lazy or anything, here is the next step - welded (although not very pretty):
Next will be cutting the excess metal, and shortening the tubes to required length.You do not have the required permissions to view the files attached to this post.
Hatz Classic plans# 136
-
- Posts: 215
- Joined: Thu Apr 08, 2010 4:56 pm
Re: Progress Update
Much lighter now...
Since the longer of the two 3/8" tubes goes all the way through the rectangular tube, I figured it is sturdy enough for this non-structural part.
In other words - I added lightness.
The one edge of the (rectangular tube) pieces which is laying on the bench is sometimes shown as being metal. In my case it is air. I did not weld anything on that edge - just removed a bunch of metal. Since the longer of the two 3/8" tubes goes all the way through the rectangular tube, I figured it is sturdy enough for this non-structural part.
In other words - I added lightness.
You do not have the required permissions to view the files attached to this post.
Hatz Classic plans# 136
- Bitshifter
- Posts: 202
- Joined: Thu Aug 02, 2012 5:12 pm
- Location: Avondale Pa
- Contact:
Re: Progress Update
I needed to throw in a progress update since I finally got it pushed out of the garage.
You do not have the required permissions to view the files attached to this post.
Ed White
HC 154
"In life 10% wrong is failure, in school it's an A"
HC 154
"In life 10% wrong is failure, in school it's an A"
-
- Posts: 114
- Joined: Sat Aug 03, 2013 5:34 pm
Re: Progress Update
NICE!!!
I love it!
Looking forward to the day when my ship is at that level of completion!
I love it!
Looking forward to the day when my ship is at that level of completion!
-
- Posts: 215
- Joined: Thu Apr 08, 2010 4:56 pm
-
- Posts: 215
- Joined: Thu Apr 08, 2010 4:56 pm
Re: Progress Update
One of my "How did you ..." pictorial essays.
This time, perpendicular tube-in tube with doublers. This is used several times in the Hatz Classic. Specifically in this case I am working on the landing gear parts.
Step 1:
I drill the hole for the bushing tube before I cut the long tube to length. This gives me freedom to drill wherever the drill bit hits the tube. Also leave enough length (1/2" ?) at the short side of the tube beyond the hole, to make things easier. Step 2:
Cut the bushing tubes over-sized, ream the hole, cut the long tube to size (measure twice!). Step 3:
Tack-weld the bushing, but only on the part that won't be cut off (see later). Step 4:
Using a combination of angle-grinder, bench grinder, jedi-force and any other trick you have, cut the long tube to shape. Step 5:
Prepare the doublers. In this case I don't think these are on the files you can download for your waterjet cutter. I just used my angle grinder to cut them from 0.050 sheet, finished on the sander. The next few steps will be in a separate post. I guess there's a limit to how many pictures or size a single post can have.
This time, perpendicular tube-in tube with doublers. This is used several times in the Hatz Classic. Specifically in this case I am working on the landing gear parts.
Step 1:
I drill the hole for the bushing tube before I cut the long tube to length. This gives me freedom to drill wherever the drill bit hits the tube. Also leave enough length (1/2" ?) at the short side of the tube beyond the hole, to make things easier. Step 2:
Cut the bushing tubes over-sized, ream the hole, cut the long tube to size (measure twice!). Step 3:
Tack-weld the bushing, but only on the part that won't be cut off (see later). Step 4:
Using a combination of angle-grinder, bench grinder, jedi-force and any other trick you have, cut the long tube to shape. Step 5:
Prepare the doublers. In this case I don't think these are on the files you can download for your waterjet cutter. I just used my angle grinder to cut them from 0.050 sheet, finished on the sander. The next few steps will be in a separate post. I guess there's a limit to how many pictures or size a single post can have.
You do not have the required permissions to view the files attached to this post.
Hatz Classic plans# 136
-
- Posts: 215
- Joined: Thu Apr 08, 2010 4:56 pm
Re: Progress Update
...(continued)
Step 6:
Position and tack-weld the doublers. Step 7:
Heat and bend the doublers. Step 8:
Ready to weld around the doubler.
Step 6:
Position and tack-weld the doublers. Step 7:
Heat and bend the doublers. Step 8:
Ready to weld around the doubler.
You do not have the required permissions to view the files attached to this post.
Hatz Classic plans# 136
-
- Posts: 178
- Joined: Thu Jul 23, 2015 9:50 am
- Location: Saskatoon, Saskatchewan, CANADA
Re: Progress Update
Nice. I haven't started on the metal other than the compression tubes but there is nothing better for building confidence than someone else making it look easy.
Murray Marien - HC 0180
Saskatoon Canada
Saskatoon Canada
-
- Posts: 215
- Joined: Thu Apr 08, 2010 4:56 pm
Re: Progress Update
Here ya go, welded all around:
Need to ream the small tubes to 5/16", shorten them to the correct length and drill the holes in the longer tubes.
Need to ream the small tubes to 5/16", shorten them to the correct length and drill the holes in the longer tubes.
You do not have the required permissions to view the files attached to this post.
Hatz Classic plans# 136