by johnkerr » Mon Nov 01, 2010 3:22 pm
Sorry, The tabulation did not transfer. Create columns for Sequence, Method, Adjust, Integer. Break each line portion under the proper heading.
Re reading this makes the rigging seem less difficult to understand than the checklist.
Rigging CHeck List-Hatz Classic
Sequence Method Adjust Integer
Center Section Plumbline dist. to long. Roll Wires equal
Center Section Incidence Dig Level @ Butt rib Rear Cabanes 0 Degrees
Lower Wing Dihedral Dig level @ Spar Landing wires equal
Lower wing incidence Dig level @ Interplane rib Rear Interplane strut 0 degrees
Upper wing Dihedral dig level @ Spar landing wires 1.5 degrees
Upper wing incidence Dig level @ Interplane rib Front interplane strut 0 degrees
Verify all measurements
Tighten all wires to uniform tension
Verify all measurements
Contact me direct for a excel spread sheet.
Sorry, The tabulation did not transfer. Create columns for Sequence, Method, Adjust, Integer. Break each line portion under the proper heading.
Re reading this makes the rigging seem less difficult to understand than the checklist.
[b]Rigging CHeck List-Hatz Classic[/b]
Sequence Method Adjust Integer
Center Section Plumbline dist. to long. Roll Wires equal
Center Section Incidence Dig Level @ Butt rib Rear Cabanes 0 Degrees
Lower Wing Dihedral Dig level @ Spar Landing wires equal
Lower wing incidence Dig level @ Interplane rib Rear Interplane strut 0 degrees
Upper wing Dihedral dig level @ Spar landing wires 1.5 degrees
Upper wing incidence Dig level @ Interplane rib Front interplane strut 0 degrees
Verify all measurements
Tighten all wires to uniform tension
Verify all measurements
Contact me direct for a excel spread sheet.